Mon–Fri 8:00–18:00 (866) 641-1069 20501 Ventura Blvd #135
Flip It Homes project near Altadena, California
San Gabriel Valley

Altadena
Renovations, ADUs & Custom Builds

Altadena is unincorporated, so permits run through Los Angeles County rather than a city building department — a different process with different timelines. We have carried ground-up ADUs through it.

10+
Years in business
150+
Completed projects
4.9
Average rating, 159 reviews
A+
BBB accredited
Building in Altadena

Your Altadena design-build contractor

Craftsman, Spanish, and mid-century homes on generous lots against the foothills, where character-sensitive renovation and detached ADUs are both common.

Every Altadena project we take on is fully permitted, inspected, and warrantied — with permits issued by Los Angeles County (unincorporated). You get one contract covering design, engineering, permits, and construction, an itemized proposal before demo begins, and a dedicated project manager who answers the phone.

Region
San Gabriel Valley
Permits issued by
Los Angeles County (unincorporated)
From our office
Woodland Hills — Mon–Fri 8:00–18:00
Recent Work

Projects in Altadena

French Countryside ADU, Altadena — Altadena

French Countryside ADU, Altadena

Altadena, CA
Studio Layout ADU Garage Conversion — North Hollywood, CA

Studio Layout ADU Garage Conversion

North Hollywood, CA
2-Bedroom ADU Garage Conversion — Tarzana, CA

2-Bedroom ADU Garage Conversion

Tarzana, CA
2-Bedroom ADU Garage Conversion — Northridge, CA

2-Bedroom ADU Garage Conversion

Northridge, CA
How We Work

A process built on clarity

01

Consultation

We walk your Altadena property, listen to your goals, and talk honestly about budget and timeline.

02

Design & Permits

Drawings, an itemized proposal, and plan check with Los Angeles County (unincorporated) handled for you.

03

Construction

Sequenced trades, a dedicated project manager, and a clean site at the end of every day.

04

The Reveal

Final inspection, a punch-list walkthrough, and a warranty that stands behind the work.

Common Questions

Altadena FAQ

Do you actually work in Altadena?

Yes — Altadena is inside our core service area and we work there regularly. Our office is at 20501 Ventura Blvd #135 in Woodland Hills, so crews and project managers reach Altadena easily, which matters for site supervision and schedule reliability.

Who issues building permits for a Altadena project?

Permits for work in Altadena are issued by Los Angeles County (unincorporated). We prepare the drawings, submit for plan check, and coordinate every inspection through final sign-off, so you never deal with the counter yourself.

Can I build an ADU in Altadena?

In most cases yes. California ADU law applies statewide, and both garage conversions and detached ground-up units are generally permitted on single-family lots, subject to local standards. We run a feasibility review on your specific parcel before you spend anything on design.

How long does a Altadena project take?

It depends on scope: bathrooms typically run three to five weeks of construction, kitchens six to ten, and whole-home renovations four to nine months plus plan-check time. You get a stage-by-stage schedule with your itemized proposal.

Do you provide a written, itemized quote?

Always. After walking the property we provide a detailed line-item proposal so you can see exactly where the budget goes and adjust scope before committing. Consultations in Altadena are free and carry no obligation.

Ready to start your Altadena project?

Book a free, no-pressure consultation. We'll walk your space, talk through options, and give you a clear, itemized proposal.