website design templates

HERE'S A SNEAK PEEK AT OUR LATEST PROJECT

THE HILLS - West Hills California
A new addition about 500 sq. ft. and a garage conversion turned into a master suite that includes a hallway, laundry room and storage.

The current garage along with a room addition will be turned into a wonderful living space.

January 7th, 2019

Reapirs and demolition are underway to create a layout that is functional.

January 15th, 2019

A layout design is completed and walls are up ready for the final phase. 

January 24th, 2019

This room is clear and ready for next stages of the remodeling process.

February 1st, 2019

The bathroom is almost done, the tub and tile are up along with the glass shower door.

February 8th, 2019

In the master bedroom with their own bathroom has been painted and the doors have been installed.

February 13th, 2019

Laundry room with cabinets for storage and a small sink on the side is up and running.

February 20th, 2019

A beauiful spacious bedroom is completed and staging has been implemented for a cozy and warm feeling.

March 12th, 2019

The master bedroom has a large closet and a door that leads to a long hallway to the rest of the space.

March 19th, 2019

Flooring and vanities have been installed and the master bathroom is completed along with all a large sink.

March 22nd, 2019

Drop a Line

We are ready to begin the remodeling journey with you!

Phone: 888.293.1889
Email: info@FlipitHomes.com